Refer to the following Cheat Sheets for further information:


Adding a new Standard Task

StepTask
1

Click  then type Standard Task Maintenance, or navigate to Production Scheduling - Maintenance - Standard Task Maintenance.

Note: By default all records are loaded.

2

Click .

3Enter a unique task Code (ID - can be alpha numeric), as well as a Description to identify the code.
4

In the Task Type field select from the drop down arrow the type of task - valid choices are Detailing, Estimating, and Manufacturing.

5

In the plant field, select the appropriate plant form the drop down menu.

The list of available options will be determined by the plants you have configured under Plant Maintenance.

6

Click .


Maintaining an existing Task

StepTask
1

Click  then type Standard Task Maintenance.

Note: By default all records are loaded.

2

Click the relevant Task line to edit it.

The task code field is non-editable. If you want to change the code you would need to delete the task and re-enter it with the new code value.

3Update the relevant fields as required.
4

Click .


Deleting a Task

StepTask
1

Click  then type Standard Task Maintenance.

Note: By default all records are loaded.

2

Click the relevant Task line you wish to delete.

3

Click .

4

Click when prompted.